RJ-ON-90/1 Production and Exploration
|
J-11011/382/2005 - IA II (I)
|
Hydrocarbon development in Barmer - Mangala, Aishwarya, Saraswati & Raageshwari
fields
|
EC Complaince Apr'24 - Sep'24
|
J-11011/175/2007 - IA II (I)
|
Hydrocarbon development and production of Guda field in Barmer and Jalore districts
|
J-11011/174/2007 - IA II (I)
|
Hydrocarbon development in Bhagyam field
|
J-11011/98/2010 - IA II (I)
|
Augmentation of crude oil production & processing capacity (140000 - 160000 BOPD
& 20.4 - 32 MMSCFD) at MPT and well pads
|
J-11011/98/2010 - IA II (I)
|
Augmentation of crude oil production capacity in MPT (160000-175000 BOPD & 32-35
MMSCFD)
|
J-11011/108/2012 - IA II (I)
|
Increase in crude oil production capacity from MPT (175,000-200,000 BOPD & 35-
40 MMSCFD)
|
J-11011/80/2013 - IA II (I)
|
Augmentation of hydrocarbon production (2,00,000-3,00,000 BOPD)
|
J-11011/25/2013 - IA II (I)
|
Drilling of Exploratory/Appraisal Wells (300)
|
J-11011/13/2018-IA-II(I)
|
Enhancement of HC Production (Crude oil 3 lakh BOPD to 4 lakh BOPD and Natural Gas
165 MMSCFD to 750 MMSCFD) within RJ-ON-90/1 Block at Barmer (Rajasthan)
|
Barmer Salaya Pipeline (Midstream)
|
J-11011/234/2007-IA II (I)
|
Oil Evacuation pipeline with associated facilities from Mangala Terminal, Barmer,
District Rajasthan to Salaya Terminal in Jamnagar District via Viramgam (Ahmedabad
district) in Gujarat by M/s CEIL - Environment Clearance reg
|
EC Compliance Report (Apr'24 to Sep'24)
|
11-34/2009-IA-III
|
CRZ and Environmental clearance for the installation and operation of two Single
Point Mooring (SPM) and interconnecting pipelines to evacuate crude oil and import
diluents to the storage terminal & installaion & operation of crude oil
terminal at Vill: Bhogat, Taluka: Kalyanpur, Distt: Jamnagar, Gujarat by
|
J-11011/444/2011-IA II (I)
|
Increase in Carrying Capacity of Crude Oil Pipeline (150,000 to 175,000 bopd) in
existing Barmer (Raj) to Bhogat (Gujrat) pipeline
|
J-11011/444/2011-IA II (I)
|
Increase in Carrying Capacity of Crude Oil Pipeline (175,000 to 200,000 bopd) in
existing Barmer (Raj) to Bhogat (Gujrat) pipeline
|
J-11011/234/2007-IA II (I)
|
Expansion in existing crude oil carrying capacity from 2,00,000 bopd to 3,00,000
bopd and natural gas carrying capacity from 6.3 mmscfd and 40 mmscfd along with the
development of new gas pipeline from Raageshwari to Palanpur in exiting project to
Bhogat (Gujarat) pipeline, dist. Barmer, Rajasthan (create link to attached document
titled ‘Integrated Midstream Augmentation Project EC’
|
PKGM-1 (Ravva) Production and Exploration
|
J-11011/50/2001-IA II
|
Exploratory drilling of 8 wells for oil and gas in the PKGM-1 offshore block in East
coast of India in the Bay of Bengal, by M/s CEIL
|
EC Compliance Report (Apr 2024 -Sep 2024)
|
10-28/2004-IA-III
|
Exploratory drilling in onshore area of PKGM-1 Block located in Chirrayanam village,
Uppulaguptam Mandal in East Godavari District
|
J-11011/11/90-IA II
|
EC for oil production from Godavari off-shore field and on-shore field terminal
facility at Surasaniyanam
|
J - 11011/6/91-IA
|
Oil/Gas Production off-Shore Field and On-Shore Field Terminal at S’Yanam
|
J-11012/59/95-IA II (I)
|
Development of the Ravva Oil & Gas field located near the Godavari Basin, A.P.
by M/s Command Petroleum (India) Pvt. Ltd. JV with ONGC - EC
|
J-11011/84/2000-IA II
|
Ravva Gas Development Project in the Bay Of Bengal, AP coast
|
J-11011/207/2004-IA II (I)
|
Infill well drilling (Development wells) in Ravva oilfield (PKGM-1) block in KG off
shore basin, Bay of Bengal, AP
|
J-11011/81/2013-IA II (I)
|
Oil and Gas Development in existing Ravva Off-shore Field, PKGM-1 Block, located off
Surasniyanam (S.Yanam) in the Bay of Bengal, East Godhavari District, Andhra Pradesh
by M/s. Cairn India Limited.
|
11-20/2015-IA.III
|
CRZ Clearance for Proposed Oil & Gas Development in Existing Ravva Offshore
Field, PKGM-1 Block, off Surasaniyanam in Bay of Bengal, East Godavari District,
Andhra Pradesh by M/s Cairn India Limited
|
CB-OS/2 (Suvali) Production and Exploration
|
J-11011/55/2000-IA II
|
Drilling of Exploratory / Appraisal wells (CB-OS/2) in the Gulf of Khambhat
|
EC Compliance Report (Apr 24 - Sep 24 )
|
J-16011/22/2002-IA III
|
CRZ Clearance for Seismic Exploration Programme in the CB-OS/2 Block in the Gulf of
Khambat in Bharuch District in Gujarat
|
J-11011/21/2001-IA II
|
Integerated development of CB-OS/2 Block (Phase 1) in the Gulf of Khambat
|
11-14/2004-IA III
|
Development of Oil production in the CB-OS-2, Block, in the Gulf of Khambhat
|
J-11011/ 109/ 2005 I A II (I)
|
Development of Oil production in the CB-OS-2, Block, in the Gulf of Khambhat
|
11-32/ 2005 -IA-III
|
Coastal Regulation Zone recommendation for oil & gas development in the
transition zone of CB/OS-2 Block Glf of Khambhat
|
J - 11011/ 20/ 2005-IA II (I)
|
Oil & Gas development in transition zone of CB-OS-2 Block in the Gulf of
Khambhat, West Coast of Gujarat
|
KG-OSN-2009/3
|
|
Exploratory and appraisal drilling of 55 nos. of wells in KG-OSN-2009/3 Block in
off-shore KG Basin, Guntur and Prakasam Districts, Andhra Pradesh.
|
Apr'24-Sep'24
|
KG-OSHP-2017/1
|
KG-OSHP-2017/1
|
|
Apr'24-Sep'24
|
GV-ONHP-2017/1
|
GV-ONHP-2017/1
|
|
Apr'24-Sep'24
|
RJ-ONHP-2017/1 |
RJ-ONHP-2017/1
|
|
Apr'24-Sep'24 |
RJ-ONHP-2017/3 |
RJ-ONHP-2017/3
|
|
Apr'24-Sep'24 |
RJ-ONHP-2017/6 |
RJ-ONHP-2017/6
|
|
Apr'24-Sep'24 |
CB-ONHP-2017/1 |
CB-ONHP-2017/1
|
|
Apr'24-Sep'24 |
CB-ONHP-2017/2 |
CB-ONHP-2017/2
|
|
Apr'24-Sep'24 |
CB-ONHP-2017/3 |
CB-ONHP-2017/3
|
|
Apr'24-Sep'24 |
CB-ONHP-2017/7 |
CB-ONHP-2017/7
|
|
Apr'24-Sep'24 |
CB-ONHP-2018/1 |
CB-ONHP-2018/1
|
|
Apr'24-Sep'24 |
CB-ONHP-2018/4 |
CB-ONHP-2018/4
|
|
Apr'24-Sep'24 |
AA-ONHP-2017/4 |
AA-ONHP-2017/4
|
|
Apr'24-Sep'24 |
AA-ONHP-2017/5 |
AA-ONHP-2017/5
|
|
Apr'24-Sep'24 |
AA-ONHP-2017/11 |
AA-ONHP-2017/11
|
|
Apr'24-Sep'24 |
AA/ONDSF/Hazarigaon/2018 |
AA/ONDSF/Hazarigaon/2018
|
|
Apr'24-Sep'24 |
CB-ONHP-2017/10 GUJ |
CB-ONHP-2017/10
|
|
Apr'24-Sep'24
|
CB-ONHP-2017/10 RAJ |
CB-ONHP-2017/10
|
|
Apr'24-Sep'24
|
RJ-ONHP-2017/2 |
RJ-ONHP-2017/2
|
|
Apr'23-Sep'24
|
RJ-ONHP-2017/4 |
RJ-ONHP-2017/4
|
|
Apr'24-Sep'24
|
RJ-ONHP-2017/5 |
RJ-ONHP-2017/5
|
|
Apr'24-Sep'24
|
RJ-ONHP-2017/7 |
RJ-ONHP-2017/7
|
|
Apr'24-Sep'24
|
AA-ONHP-2017/1 |
AA-ONHP-2017/1
|
|
Apr'24-Sep'24
|
AA-ONHP-2017/3 |
AA-ONHP-2017/3
|
|
Apr'24-Sep'24
|
AA-ONHP-2018/1 |
AA-ONHP-2018/1
|
|
Apr'24-Sep'24
|
CB-ONHP-2018/3 |
CB-ONHP-2018/3
|
|
Apr'24-Sep'24
|